Item request has been placed! ×
Item request cannot be made. ×
loading  Processing Request
Periodical

COVID or Not, Prefabrication is Trending Up.

Subjects: *COVID-19; MODULAR construction

  • Source: Contractor Magazine. Mar2021, Vol. 66 Issue 3, p16-17. 2p.

Record details

×
Periodical

BLOX Looks for a Better Way To Build Projects.

Subjects: *COVID-19; *PRODUCTION engineering; *CONSTRUCTION industry

  • Source: ENR: Engineering News-Record. 6/8/2020, Vol. 284 Issue 12, p24-25. 2p. 1 Color Photograph.

Record details

×
Academic Journal

The modular structure of posttraumatic stress disorder in adolescents.

Subjects: POST-traumatic stress disorder; MODULAR construction; TEENAGERS

  • Source: Current Psychology. Jun2023, Vol. 42 Issue 16, p13252-13264. 13p.

Record details

×
Academic Journal

Application of Takt and Kanban to Modular Wind Turbine Construction.

Subjects: *JUST-in-time systems; *WIND power; *LABOR productivity

  • Source: Journal of Construction Engineering & Management. Feb2022, Vol. 148 Issue 2, p1-14. 14p.

Record details

×
Periodical

Never standing still.

Subjects: *COVID-19 pandemic; *EMAIL; *CONSTRUCTION industry

  • Source: International Construction. Sep2020, Vol. 58 Issue 7, p34-35. 2p.

Record details

×
Periodical

COVID-19.

Subjects: *COVID-19; *HEALTH facilities; *PERSONAL protective equipment

  • Source: Canadian Consulting Engineer. May2020, Vol. 61 Issue 3, p6-8. 3p.

Record details

×
  • 1-9 of  9 results for ""MODULAR construction""