The article reports that Network Rail Ltd. has began staff consultation on a 25-year strategy that plans to eliminate about 800 signalboxes and concentrate on control of national network in 14 Rail Operating Centres. The plan is a key element in its proposals for Control Period 5. Network Rail wants to accelerate renewels of signalling before the routine replacement.
No Comments.