Implementation of BIM in an advanced construction project: A case study on the Labuang Baji regional hospital parking structure.

Item request has been placed! ×
Item request cannot be made. ×
loading   Processing Request
  • Additional Information
    • Abstract:
      Building Information Modeling (BIM), an information management method for efficient building design, construction, and operation, involves creating a 3D model integrated with the design. Applied in the construction industry, BIM, particularly using Tekla Structures software, facilitates project development. A case study at Labuang Baji Regional Hospital in Makassar highlights the use of Tekla Structures for detailed design and structural planning. The showcased 3D modeling aids in visualizing construction phases, minimizing errors during on-site operations. Additionally, Tekla's structural analysis software enhances reinforcement modeling, providing clear information on placement, shape, and length of connections, assisting in determining the appropriate number of stirrups. Tekla Structures proves to be a valuable tool for modeling complex building structures, streamlining processes in construction projects. [ABSTRACT FROM AUTHOR]
    • Abstract:
      Copyright of AIP Conference Proceedings is the property of American Institute of Physics and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)