Two parallel-machine scheduling with maximum waiting time for an emergency job.

Item request has been placed! ×
Item request cannot be made. ×
loading   Processing Request
  • Additional Information
    • Abstract:
      In modern manufacturing and service industries, urgent orders and service tasks are common, and the speed of handling such urgent tasks is an important indicator of production and service efficiency. In this study, we consider scheduling jobs on two parallel machines with the random arrival of an emergency job. The objective is to minimise the makespan, subject to a given maximum waiting time of the emergency job. We first show that the worst-case ratio of the existing algorithm LPT $ _l $ l -SPT $ _{m-l} $ m − l is at least 3/2 when m = 2. We then analyse some properties of the optimal schedule and derive lower bounds on the optimal makespan. Finally, we present an improved approximation algorithm with a tight worst-case ratio of 4/3. We also provide numerical results showing that our proposed algorithm outperforms algorithm LPT $ _l $ l -SPT $ _{m-l} $ m − l . [ABSTRACT FROM AUTHOR]
    • Abstract:
      Copyright of International Journal of Production Research is the property of Taylor & Francis Ltd and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)