Barriers to the growth of indigenous construction firms in Nigeria.

Item request has been placed! ×
Item request cannot be made. ×
loading   Processing Request
  • Additional Information
    • Abstract:
      Purpose: Studies focusing on the growth of indigenous construction firms (ICFs) are getting dated, and unreflective of recent policy changes in developing countries. This study sought to analyze critical barriers to the growth of ICFs and obtain an unsupervised parsimonious grouping of the barriers for policy improvements. Design/methodology/approach: A mix of quantitative and qualitative research methods was adopted for the study. ICFs in Nigeria were cross-sectionally surveyed based on a set of firm growth barriers obtained from literature and refined by focus group discussion. Descriptive (means, standard deviations, percentages) and inferential (Kruskal-Wallice and Mann-Whitney U test) statistics were used in the analyses of the data. Factor analysis was used to group the variables. Findings: Results showed that "declining" ICFs are more negatively impacted by low construction mechanization/use of labor intensive methods, inadequate geographical reach of operations, and inadequate flow of jobs/low demand than "stunted" and "growing" ICFs. The three main domains of critical barriers to the growth of ICFs were identified in descending order of importance as low patronage, difficulty accessing funds, and business management incapacity. Research limitations/implications: The study recommends improvements in access to funds for ICFs by increasing the percentage of advance payments, and creating a pool of equipment for easy hire by ICFs. ICFs are advised to seek information on tendering opportunities outside their regions of domicile in order to increase their patronage. Originality/value: This study reveals differences in the impacts of growth barriers on ICFs at different growth levels. This study also clarifies persisting barriers to the growth of ICFs [primarily construction micro, small and medium-sized enterprises (MSMEs)] from a developing country perspective using a longer list of variables. [ABSTRACT FROM AUTHOR]
    • Abstract:
      Copyright of Engineering Construction & Architectural Management (09699988) is the property of Emerald Publishing Limited and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)